Settlement sewerages
- DATE OF AWARD - COMPLETION
- NAME, POSITION AND BRIEF DESCRIPTION OF THE DESIGN
- 2018
- WASTE DRAINAGE NETWORK DESIGN WITH 12 PUMP STATIONS AND BIOLOGICAL WASTEWATER PROCESSING CENTER OF THE MUNICIPALITY PARGA / PREVEZA.
-
The project includes four municipal departments drainage system with interposed pumping stations wich end in a biological wastewater treatment center.
- BUDGET: 15.000.000 €
- PARTICIPATION PERCENTAGE: 100 %
- CLIENT: MUNICIPALITY OF FANARI
- 1994
- ELECTROMECHANICAL DESIGN OF MEDIUM AND LOW VOLTAGE, PHONE AND CABLE TV NETWORKS IN ALONIA VILLAGE, KRANIDI MUNICIPALITY, ARGOLIDA.
-
The village comprises residences, a hotel, public facilities, sports facilities, waste collection and treatment systems, a biological wastewater treatment unit. All designed networks are installed underground. The calculated electrical power is 1400 KVA.
- BUDGET: 3.700.000 €
- PARTICIPATION PERCENTAGE: 100 %
- CLIENT: INVESTUR S.A.