ΠΛΗΡΟΦΟΡΙΕΣ & ΕΝΗΜΕΡΩΣΗ ΣΤΟΥΣ ΧΡΗΣΤΕΣ ΤΗΣ ΙΣΤΟΣΕΛΙΔΑΣ ΜΑΣ

Airports


  • DATE OF AWARD - COMPLETION
  • NAME, POSITION AND BRIEF DESCRIPTION OF THE DESIGN
  • 2021
  • ELECTROMECHANICAL DESIGN OF THE PROJECT: RESTORATION AND UPGRADING OF THE HISTORICAL LISTED BUILDING "FLISVOS" IN THE MUNICIPALITY OF PALEO FALIRO.
  • It is an historical listed building of 780m2 that is converted into events and exhibition halls. It includes an event hall with a capacity of 90 people.

  • BUDGET: 1.300.000 €
  • PARTICIPATION PERCENTAGE: 100 %
  • CLIENT: MUNICIPALITY OF PALAIO FALIRO
  •  
  • 2018
  • INDEPENDENT REVIEWER (IR) FOR SIX (6) AIRPORTS OF FRAPORT PROJECT IN GREECE (THE PROJECT INCLUDES FOURTEEN (14) AIRPORTS).
  • The 6 Airports are: THESSALONIKI, CHANIA, MYKONOS, SKIATHOS, AKTIO, KAVALA.

  • BUDGET: 200.000.000 €
  • PARTICIPATION PERCENTAGE: 0 %
  • CLIENT: AECOM SA/ANAPLASI SA
  •  
  • 1995-1996
  • ELECTROMECHANICAL DESIGN OF PROJECT "DESIGN AND CONSTRUCTION OF A NEW AIRPORT BUILDING AND LANDSCAPING ON STATE AIRPORT 'M. ALEXANDROS', KAVALA".
  • The project includes arrival and departure halls, offices, a control tower. All areas are air-conditioned.

  • BUDGET: 7.902.000 €
  • PARTICIPATION PERCENTAGE: 50 %
  • CLIENT: ANASTILOTIKI S.A. - THOLOS S.A.
  •  
  • 1989-1990
  • ELECTROMECANICAL DESIGN OF THE PROJECT "NEW AIRPORT OF SANTORINI ISLANT"
  • The project includes arrival and departure halls, offices, a control tower. All areas are air-conditioned. A 630 KVA power substation was installed in the building. Lighting design of the landing/taking off runway was performed.

  • BUDGET: 5.500.000 €
  • PARTICIPATION PERCENTAGE: 50 %
  • CLIENT: KATASKEYH S.A.
  •