School-Educational buildings


  • DATE OF AWARD - COMPLETION
  • NAME, POSITION AND BRIEF DESCRIPTION OF THE DESIGN
  • 2020
  • ELECTROMECHANICAL DESIGN OF THE PROJECT: "MUSIC SCHOOL OF CORINTH" IN THE MUNICIPALITY OF CORINTHIA.
  • This is a building of 5,500m2. It has an event hall for 350 people, an indoor gym, workshop areas, office space, etc. The building is air conditioned and has a 1,000KVA power substation and 350KVA power generator.

  • BUDGET: 7.000.000 €
  • PARTICIPATION PERCENTAGE: 100 %
  • CLIENT: MUNICIPALITY OF CORINTHIA - SUSTAINABLE CITY SA
  •  
  • 2019-2020
  • ELECTROMECHANICAL DESIGN OF THE PROJECT: «RENOVATION AND ENERGY UPGRADING OF HELLENIC COST GUARD BUILDING» IN PIRAEUS
  • This is an 8 storey building of 5,500m2. It has dormitories for 300 students, classrooms, workshop areas, offices, gyms, restaurants, etc. The building is air conditioned and has an electrical substation of 800KVA and a 275KVA power generator. The buildings’ energy performance was upgraded to class B+.

  • BUDGET: 5.500.000 €
  • PARTICIPATION PERCENTAGE: 100 %
  • CLIENT: MINISTRY OF MARITIME AFFAIRS AND INSULAR POLICY
  •  
  • 2015
  • ELECTROMECHANICAL DESIGN OF THE PROJECT: "9th NURSERY SCHOOL OF KIFISIA, ATHENS"
  • It is a 500sq.m. nursery school.

  • BUDGET: 1.550.000 €
  • PARTICIPATION PERCENTAGE: 100 %
  • CLIENT: MUNICIPALITY OF KIFISIA
  •  
  • 2015
  • ELECTROMECHANICAL DESIGN OF THE PROJECT: "10th NURSERY SCHOOL OF KIFISIA, ATHENS"
  • It is a 500sq.m. nursery school.

  • BUDGET: 1.400.000 €
  • PARTICIPATION PERCENTAGE: 100 %
  • CLIENT: MUNICIPALITY OF KIFISIA
  •  
  • 2007
  • ELECTROMECHANICAL DESIGN OF PROJECT : "EXPANSION OF 10th ELEMENTARY SCHOOL IN TRIKALA".
  • The project included the addition of a 2.500 sq.m. new building and a 1.000 sq.m. existing building restoration. The buildings include classrooms, offices, laboratories, auditorium for 300 people and extensive surroundings with sports facilities.

  • BUDGET: 4.200.000 €
  • PARTICIPATION PERCENTAGE: 100 %
  • CLIENT: DISTRICT OF TRIKALA
  •  
  • 2006
  • ELECTROMECHANICAL DESIGN OF PROJECT : " CONSTRUCTION OF 2nd PRIMARY SCHOOL, VRILISSIA".
  • It concerns an addition of a 1.500 sq.m. building, in the existing primary school building. The new building extends over three levels. A electromecanical design of the surounding area, including sports facilities was also done.

  • BUDGET: 2.544.000 €
  • PARTICIPATION PERCENTAGE: 100 %
  • CLIENT: MUNICIPALITY OF VRILISSIA
  •  
  • 2003
  • ELECTROMECHANICAL DESIGN OF PROJECT "11th UPPER SECONDARY SCHOOL (HIGH SCHOOL), 13th LOWER SECONDARY SCHOOL, 16th LOWER SECONDARY SCHOOL, 24th NURSERY SCHOOL, MUNICIPALITY OF PERISTERI".
  • It is a school complex in the Municipality of Peristeri, Attica.

  • BUDGET: 4.168.000 €
  • PARTICIPATION PERCENTAGE: 100 %
  • CLIENT: KAPETANIDI BROTHERS A.T.E.
  •  
  • 2002 - 2008
  • ELECTROMECHANICAL DESIGN OF PROJECT "HISTORIC LISTED BUILDING RESTORATION, IN ORDER TO CREATE SCHOOL OF FINE ARTS, IN THE OLD TOWN OF CHANIA, CRETE".
  • The project includes the restoration of a 2.500sq.m. historic listed building, on three levels and its configuration to accommodate the School of Fine Arts. It includes offices, classrooms, laboratories, laboratories of sculpture, printmaking, painting, religious painting, metal etc. The areas are air-conditioned and a 630KVA power substation has been installed.

  • BUDGET: 3.900.000 €
  • PARTICIPATION PERCENTAGE: 100 %
  • CLIENT: UNIVERSITY OF CRETE
  •  
  • 2000
  • ELECTROMECHANICAL DESIGN OF PROJECT "PRIMARY SCHOOL IN LEPTOKARYA AND PRIMARY SCHOOL IN VLAHATA''.
  • These are two independent primary school buildings that include lecture rooms, offices and laboratories.

  • BUDGET: 2.245.000 €
  • PARTICIPATION PERCENTAGE: 100 %
  • CLIENT: BES S.A.
  •  
  • 1997
  • ELECTROMECHANICAL DESIGN OF PROJECT "ADDITION OF FIRST FLOOR TO ENGINEERING SCHOOL OF TECHNOLOGICAL INSTITUTE OF ATHENS".
  • The addition of first floor includes offices and computer rooms. All rooms are air-conditioned. Data communication network (DATA) has been installed in every classroom.

  • BUDGET: 1.816.000 €
  • PARTICIPATION PERCENTAGE: 100 %
  • CLIENT: ESPEROS LTD
  •  
  • 1997
  • ELECTROMECANICAL STUDY OF PROJECT "ADDITION OF SECOND FLOOR TO ARTISTIC STUDIES SCHOOL OF TECHNOLOGICAL INSTITUTE OF ATHENS".
  • The addition of the second floor includes offices, classrooms and conference workshops. All rooms are air-conditioned.

  • BUDGET: 3.481.000 €
  • PARTICIPATION PERCENTAGE: 100 %
  • CLIENT: ANAPTIXI S.A.
  •  
  • 1997
  • ELECTROMECHANICAL DESIGN OF PROJECT "CONSTRUCTION OF 8th SECONDARY SCHOOL IN LARISSA".
  • BUDGET: 1.525.000 €
  • PARTICIPATION PERCENTAGE: 100 %
  • CLIENT: B.E.S. S.A.- A. KOLOTSIOS
  •  
  • 1994-1995
  • ELECTROMECHANICAL DESIGN OF PROJECT "DESIGN AND CONSTRUCTION OF LOWER SECONDARY SCHOOL AND UPPER SECONDARY SCHOOL (HIGH SCHOOL) IN KANYTHOS, CHALKIDA"
  • BUDGET: 1.933.000 €
  • PARTICIPATION PERCENTAGE: 100 %
  • CLIENT: GEORGE TZANETOS - KONSTANTINOS TSIOYFIS
  •  
  • 1994
  • ELECTROMECHANICAL DESIGN OF PROJECT "CONSTRUCTION OF SIX NURSERY SCHOOLS IN GREECE"
  • The project includes a total of six kindergarten buildings constructed in different parts of the country.

  • BUDGET: 1.928.000 €
  • PARTICIPATION PERCENTAGE: 100 %
  • CLIENT: BES S.A
  •  
  • 1993-1995
  • ELECTROMECANICAL STUDY OF THE PROJECT "AMPHITHEATERS AND CLASSROOMS OF THE CENTRAL BUILDING, PATRA UNIVERSITY"
  • The building comprises of two conference rooms of 1000 capacity each, a music room of 300 people capacity, six rooms of 100 people capacity and offices. All rooms are equipped with translation and electroacoustic systems, translators and projection booths. All building's areas are air conditioned by 14 air conditioning units and the installed cooling capacity is increased to 200 RT. A 150 KVA generator has been installed to the building.

  • BUDGET: 12.000.000 €
  • PARTICIPATION PERCENTAGE: 50 %
  • CLIENT: EYKLIDIS S.A.
  •  
  • 1992-1993
  • ELECTROMECHANICAL DESIGN OF PROJECT "ISLAMIC UNIVERSITY IN MADINAH" SAUDI ARABIA
  • The project is a "closed city" of 20,000 residents in total, including except of the university buildings, houses, sports facilities, hospitals, shopping centers, etc. . For this project, our Office developed (based on U.S. regulations), heating-ventilating and air conditioning designs, high and low voltage electrical designs, plumbing, and fire alarm and fire-fighting systems for the following buildings: a. SEN ADMIN PRESIDENT'S HOUSE A two-storey, 1.500 m2 residence of the President of the University, equiped with air-conditioning system. b. SEN ADMIN VICE PRESIDENT'S HOUSE Four two-storey residences, 1200m2 each, of the Vice Presidents of the University, equiped with air-conditioning system. c. FAC and SERVICES STAFF HOUSING (2 Bedrooms) Two-bedroom, two-storey houses, 450sq.m. each, of the professors of the University, equiped with air-conditioning system. d. FAC and SERVICES STAFF HOUSING (3 Bedrooms) Three-bedroom, two-storey houses, 500sq.m. each, of the professors of the University, equiped with air-conditioning system. e. FAC and SERVICES STAFF HOUSING (4 Bedrooms) Four-bedroom, two-storey houses, 600sq.m. each, of the professors of the University, equiped with air-conditioning system. f. BOY'S SCHOOL Boys high school building, of a total area of ​​12.000m2. The building comprises halls, laboratories, offices, and an indoor sports center. All areas are air-conditioned. g. GIRL'S SCHOOL Girls high school building, a total area of ​​10.000m2. The building comprises halls, laboratories, and an indoor sports center. All areas are air-conditioned.

  • BUDGET: 49.445.000 €
  • PARTICIPATION PERCENTAGE: 100 %
  • CLIENT: DAR AL RIYADH
  •