ΠΛΗΡΟΦΟΡΙΕΣ & ΕΝΗΜΕΡΩΣΗ ΣΤΟΥΣ ΧΡΗΣΤΕΣ ΤΗΣ ΙΣΤΟΣΕΛΙΔΑΣ ΜΑΣ

Office Buildings


  • DATE OF AWARD - COMPLETION
  • NAME, POSITION AND BRIEF DESCRIPTION OF THE DESIGN
  • 2020
  • ELECTROMECHANICAL DESIGN OF THE PROJECT: ENERGY UPGRADING OF PIRAEUS MUNICIPAL LIBRARY.
  • It is a 9 storey building of 1.200m2. The energy upgrading includes the dismantling of the old air conditioning system and the installation of new air conditioning and lighting systems, with LED technology luminaires and automation for the control and management of the systems.

  • BUDGET: 1.000.000 €
  • PARTICIPATION PERCENTAGE: 100 %
  • CLIENT: MUNICIPALITY OF PIRAEUS
  •  
  • 2020
  • ELECTROMECHANICAL DESIGN OF THE PROJECT: "NEW CITY HALL OF KYMI-ALIVERI"
  • It is a 3 storey building of 2,500m2 in Aliveri, with parking area on the basement, event halls, offices, etc. The building is classified in energy class A+ and includes a medium voltage power substation with a 630KVA generator.

  • BUDGET: 3.000.000 €
  • PARTICIPATION PERCENTAGE: 100 %
  • CLIENT: MUNICIPALITY OF KIMI – ALIVERI
  •  
  • 2017
  • OFFICE AND STORAGE BUILDINGS IN OLYMIADA, CHALKIDIKI
  • The project includes the renovation of an existing building and the superposition of an extra story (total area of 1.900sq.m), to be used as offices. It also includes the construction of a storage building of 800sq.m, in Olympiada, Chalkidiki.

  • BUDGET: 2.900.000 €
  • PARTICIPATION PERCENTAGE: 100 %
  • CLIENT: HELLAS GOLD S.A.
  •  
  • 2016
  • ELECTROMECHANICAL STUDY FOR SAVING ENERGY OF THE ADMINISTRATION BUILDING OF OKAA S.A. IN ATHENS, GREECE.
  • It is a building of 1.000sq.m and the project includs the renovation and remodeling of electrical and mechanical installations in order to obtain 65% energy saving.

  • BUDGET: 300.000,00 €
  • PARTICIPATION PERCENTAGE: 100 %
  • CLIENT: OKAA S.A.
  •  
  • 2016
  • RENOVATION OF THE 7th FLOOR OF ESHEA (JURNALIST UNION) BUILING IN ATHENS.
  • The project includs the renovation and remodeling of all electrical and mechanical installations of the 7th floor of ESHEA building (230sq.m).

  • BUDGET: 200.000,00 €
  • PARTICIPATION PERCENTAGE: 100 %
  • CLIENT: JURNALIST UNION
  •  
  • 2012
  • ELECTROMECHANICAL DESIGN AND SUPERVISION OF PROJECT: REPLACEMENT OF THE OLD MAIN ELECTRICAL INSTALLATIONS OF A BUILDING, ON 20 ACADEMY STR., PROPERTY OF JOURNALIST UNION OF ATHENS.
  • The project included the complete replacement of the low voltage installations, of a total power of 320KVA.

  • BUDGET: 100.000 €
  • PARTICIPATION PERCENTAGE: 100 %
  • CLIENT: JOURNALIST UNION OF ATHENS
  •  
  • 2012
  • ELECTROMECHANICAL DESIGN AND SUPERVISION OF CONSTRUCTIONS OF THE PROJECT: RENOVATION OF CONFERENCE HALL ON FIRST FLOOR OF A BUILDING, ON 20 ACADEMIE STR., PROPERTY OF JOURNALIST UNION OF ATHENS.
  • It is a 200 people capacity hall, in which air-conditioning system, sound systems, microphones, projectors and translation systems have been installed.

  • BUDGET: 180.000 €
  • PARTICIPATION PERCENTAGE: 100 %
  • CLIENT: JOURNALIST UNION OF ATHENS
  •  
  • 2011
  • ELECTROMECHANICAL DESIGN OF THE PROJECT: CONFIGURATION OF EXISTING BUILDING FOR THE CONSTRUCTION OF OFFICE AREA, CSL COMPANY BEHRING HELLAS MELE.
  • This is part of 400 m2, multi-storey building on the Ch. Mexi street in Athens, in which air conditioning, strong currents, weak stream, etc designs were performed.

  • BUDGET: 450.000 €
  • PARTICIPATION PERCENTAGE: 100 %
  • CLIENT: I. & D. MAKRAKIS Ltd.
  •  
  • 2010
  • ELECTROMECHANICAL DESIGN OF PROJECT: "MODERNIZATION OF MEDIUM VOLTAGE SUBSTATION OF THE MAIN MANAGEMENT BUILDING OF HELLENIC POSTBANK ON 2-6 PEZMAZOGLOU STR., ATHENS".
  • The 12.000m ² building extends on 2 underground and 7 above ground levels. The building's substation was modernized with a new transformer of 2000KVA, a generator of 600KVA and a UPS of 300KVA.

  • BUDGET: 267.000 €
  • PARTICIPATION PERCENTAGE: 100 %
  • CLIENT: HELLENIC POSTBANK
  •  
  • 2009
  • ELECTROMECHANICAL DESIGN OF PROJECT "MODERNIZATION OF ALL EXISTING ELECTROMECHANICAL INSTALLATIONS OF THE 1st AND 2nd BASEMENTS, OF THE MAIN MANAGEMENT BUILDING, OF HELLENIC POSTBANK, ON 2-6 PEZMAZOGLOU STR., ATHENS.
  • The 12.000m ² building extends on 2 underground and 7 above ground levels. Modernization design of all existing central electromechanical installations of the 2 basements was made.

  • BUDGET: 685.000 €
  • PARTICIPATION PERCENTAGE: 100 %
  • CLIENT: HELLENIC POSTBANK
  •  
  • 2009
  • ELECTROMECHANICAL DESIGN OF PROJECT: "AIR CONDITIONING SYSTEM OF GROUND FLOOR AND FIRE PROTECTION SYSTEM OF 1st AND 2nd BASEMENT OF CENTRAL SERVICE HALL OF HELLENIC POSTBANK, ON 2-6 PEZMAZOGLOU STR., ATHENS.
  • The 12.000m ² building extends on 2 underground and 7 above ground levels. The project includes the modernization design of the air conditioning system installation of the ground floor trading room, and the fire protection systems design of the basements.

  • BUDGET: (E/M) 428.000 €
  • PARTICIPATION PERCENTAGE: 100 %
  • CLIENT: HELLENIC POSTBANK
  •  
  • 2009
  • AIR CONDITIONING SYSTEM DESIGN FOR AN OFFICE BUILDING ON 1 ARISTEIDOU STR., ATHENS.
  • The 6-level, ​900sq.m. building was constructed in 1930.

  • BUDGET: 171.000 €
  • PARTICIPATION PERCENTAGE: 100 %
  • CLIENT: HELLENIC POSTBANK
  •  
  • 2008-2011
  • ΕΚΠΟΝΗΣΗ ΠΡΟΜΕΛΕΤΗΣ, ΟΡΙΣΤΙΚΗΣ ΜΕΛΕΤΗΣ , ΜΕΛΕΤΗΣ ΕΦΑΡΜΟΓΗΣ & ΤΕΥΧΩΝ ΔΗΜΟΠΡΑΤΗΣΗΣ ΤΟΥ ΕΡΓΟΥ "ΔΗΜΟΣΙΑ ΚΕΝΤΡΙΚΗ ΒΙΒΛΙΟΘΗΚΗ ΡΕΘΥΜΝΟΥ"
  • The project includes a 3-level, 1500sq.m building. It includes libraries, areas of rare books, reading rooms, offices, classrooms and two basement levels with mechanical rooms and parkings.

  • BUDGET: 3.500.000 €
  • PARTICIPATION PERCENTAGE: 25 %
  • CLIENT: HELLENIC MINISTRY OF EDUCATION
  •  
  • 2007
  • COST - BENEFIT ANALYSIS AND TECHNICAL STUDY OF AIR CONDITIONING SYSTEM SELECTION, FOR THE MAIN BUILDING OF THE HELLENIC POSTBANK, ON 2-6 PEZMAZOGLOU STR., IN ATHENS.
  • The 12.000sq.m building spans over 2 underground and 7 aboveground levels.

  • BUDGET: - €
  • PARTICIPATION PERCENTAGE: 100 %
  • CLIENT: HELLENIC POSTBANK
  •  
  • 2003
  • ELECTROMECHANICAL DESIGN OF PROJECT "CONSTRUCTION OF PERISTERI'S TOWN HALL AND UNDERGROUND PARKING".
  • It is a building of 10.000sq.m. The parking lot spans two underground levels.

  • BUDGET: 13.750.000 €
  • PARTICIPATION PERCENTAGE: 100 %
  • CLIENT: KAPETANIDI BROTHERS S.A
  •  
  • 2003
  • ELECTROMECHANICAL DESIGN OF PROJECT : "EIGHT STOREY OFFICE BUILDING RENOVATION PROPERTY OF MINISTRY OF CULTURE, 42 BOUBOULINAS STR., ATHENS".
  • It concerns the renovation and remodeling of all electrical and mechanical installations of an eight-storey existing building, with meeting rooms and public offices.

  • BUDGET: 458.500 €
  • PARTICIPATION PERCENTAGE: 100 %
  • CLIENT: HELLENIC MINISTRY OF CULTURE
  •  
  • 2001
  • ΑΠΟΚΑΤΑΣΤΑΣΗ ΝΕΟΚΛΑΣΙΚΟΥ ΚΤΙΡΙΟΥ ΕΠΙ ΤΗΣ Λ. ΑΘΗΝΩΝ – ΣΟΥΝΙΟΥ ΠΑΛΑΙΟ ΔΗΜΑΡΧΕΙΟ ΚΕΡΑΤΕΑΣ.
  • Πρόκειται για μετατροπή του κτιρίου (500 m2) σε πολιτιστικό κέντρο με αίθουσες, γραφεία, internet caffe κ.λ.π. Έγιναν μελέτες υδραυλικών, ισχυρών και ασθενών ρευμάτων, κλιματισμού, πυρόσβεσης.

  • BUDGET: 695.000 €
  • PARTICIPATION PERCENTAGE: 100 %
  • CLIENT: ΔΗΜΟΣ ΚΕΡΑΤΕΑΣ – ΑΚΤΑ Α.Τ.Ε.
  •  
  • 2000
  • ELECTROMECHANICAL DESIGN OF PROJECT "CONSTRUCTION OF MERTZIANI'S BORDER STATION"
  • The project included reception and control building, disinfection area, weighbridges. A road lighting, water and the drainage of rainwater study was done to the extensive surroundings. All areas of the building are air-conditioned. A 500KVA power substation has been installed in the complex.

  • BUDGET: 4.348.000 €
  • PARTICIPATION PERCENTAGE: 100 %
  • CLIENT: T.O.KAT S.A. – PERIBALLON S.A.
  •  
  • 1997
  • ELECTROMECHANICAL DESIGN OF PROJECT "OFFICE AND CONFERENCE CENTER BUILDING CONSTRUCTION IN CHALKIDA, GREECE"
  • It's about 2 buildings 17.000m2 and 7.000m2, respectively. Both buildings are air conditioned. 1600 and 800 KVA power substations were installed respectively.

  • BUDGET: 10.527.000 €
  • PARTICIPATION PERCENTAGE: 50 %
  • CLIENT: EYKLIDIS S.A.
  •  
  • 1997
  • ELECTROMECHANICAL DESIGN OF PROJECT "CONFIGURATION OF HELLENIC TELECOMMUNICATIONS ORGANIZATIONS' ADMINISTRATION BUILDING’’.
  • The project included offices, seminar rooms, conference and meeting rooms. All rooms are air-conditioned. Projectors, sound systems and video conferencing systems have been installed in the conference room.

  • BUDGET: 7.370.000 €
  • PARTICIPATION PERCENTAGE: 50 %
  • CLIENT: BIOTER S.A.- ENTECHNOS S.A.- ERKYNA S.A.
  •  
  • 1997
  • ELECTROMECHANICAL DESIGN OF PROJECT "FOUR MILITARY BUILDINGS CONSTRUCTION, "KALINSKI" CAMP (SPECIAL FORCES TRAINING CENTRE)".
  • It's about four independent buildings. Each building includes offices, dormitories and a multipurpose room.

  • BUDGET: 4.000.000 €
  • PARTICIPATION PERCENTAGE: 100 %
  • CLIENT: B.E.S. S.A. – PAN. LAFES
  •  
  • 1996-1998
  • ELECTROMECHANICAL DESIGN OF PROJECT "CONSTRUCTION OF SAGIADAS' BORDER STATION"
  • The project included reception and control building, disinfection area, weighbridges. A road lighting, water supply and the drainage of rainwater design was done to the extensive surroundings. All areas of the building are air-conditioned. A 500KVA power substation has been installed in the complex.

  • BUDGET: 2.992.000 €
  • PARTICIPATION PERCENTAGE: 100 %
  • CLIENT: CHARILAOS TOLIS S.A.
  •  
  • 1995
  • ELECTROMECHANICAL DESIGN OF PROJECT "CONSTRUCTION OF CUSTOMS OFFICE IN IGOUMENITSA PORT."
  • The project includes a vehicle control room with exhaust evacuation system (type MOT), office facilities etc.

  • BUDGET: 1.130.000 €
  • PARTICIPATION PERCENTAGE: 100 %
  • CLIENT: CH. GKONTAS S.A. - Ν. ΚΟΤSINAS S.A.-Ε. KOYTRAS S.A
  •  
  • 1994
  • ELECTROMECHANICAL DESIGN OF PROJECT "CONSTRUCTION OF OFFICES BUILDING, PROPERTY OF T.P.E.D.E. ON 43 AG. CONSTANTINOU STREET, ATHENS."
  • The building spans six floors of offices and shops. All areas are air-conditioned. A 500 KVA power substation and a 125 KVA power generators have been installed in the building.

  • BUDGET: 3.412.000 €
  • PARTICIPATION PERCENTAGE: 50 %
  • CLIENT: EYKLIDIS S.A.
  •