Cultural buildings


  • DATE OF AWARD - COMPLETION
  • NAME, POSITION AND BRIEF DESCRIPTION OF THE DESIGN
  • 2021
  • ELECTROMECHANICAL DESIGN OF THE PROJECT: RESTORATION AND UPGRADING OF THE HISTORICAL LISTED BUILDING "FLISVOS" IN THE MUNICIPALITY OF PALEO FALIRO.
  • It is an historical listed building of 780m2 that is converted into events and exhibition halls. It includes an event hall with a capacity of 90 people.

  • BUDGET: 1.300.000 €
  • PARTICIPATION PERCENTAGE: 100 %
  • CLIENT: MUNICIPALITY OF PALAIO FALIRO
  •  
  • 2021
  • ELECTROMECHANICAL DESIGN OF THE PROJECT: "NEW CULTURAL BUILDING OF KIMI-ALIVERI"
  • The building has an event/conference room with a capacity of 350 people.

  • BUDGET: 2.000.000 €
  • PARTICIPATION PERCENTAGE: 100 %
  • CLIENT: MUNICIPALITY OF KIMI – ALIVERI
  •  
  • 2020
  • ELECTROMECHANICAL DESIGN OF THE PROJECT: "KYRIAKOULEIO CULTURAL CENTER" IN THE MUNICIPALITY OF MEGARA.
  • It is an historical building of 520m2 that is renovated and configurated to accommodate offices and an event hall. The building is air conditioned and it is upgraded to B+ energy class.

  • BUDGET: 1.200.000 €
  • PARTICIPATION PERCENTAGE: 100 %
  • CLIENT: MUNICIPALITY OF MEGARA
  •  
  • 2020
  • RENOVATION OF HISTORIC BUILDING ON GRIPONISIOTOU STREET IN THE CITY OF LEVADIA.
  • This is an historical listed building of 500m2 that is renovated and converted to accommodate office spaces and an event hall. The building is air conditioned and is classified in energy class B+.

  • BUDGET: 1.000.000 €
  • PARTICIPATION PERCENTAGE: 100 %
  • CLIENT: MUNICIPALITY OF LEVADIA
  •  
  • 2020
  • ELECTROMECHANICAL DESIGN OF THE PROJECT: "BUILDING HILIGHTING AND RESTORATION OF THE GAZI OMER MOSQUE MONUMENT" IN THE MUNICIPALITY OF LEVADIA.
  • It is an historical listed building of 200m2 that is renovated and converted to accommodate cultural events.

  • BUDGET: 400.000 €
  • PARTICIPATION PERCENTAGE: 100 %
  • CLIENT: MUNICIPALITY OF LEVADIA
  •  
  • 2015-2016
  • RENOVATION OF HISTORICAL AND FOLKLORE MUSEUM OF CORINTH.
  • It's a building of 800sq.m and the project includs the renovation and remodeling of all electrical and mechanical installations.

  • BUDGET: 1.850.000,00 €
  • PARTICIPATION PERCENTAGE: 100 %
  • CLIENT: FOLKLORE MUSEUM OF CORINTH
  •  
  • 2006-2009
  • ELECTROMECHANICAL DESIGN OF PROJECT "HISTORIC LISTED BUILDING RESTORATION, IN ORDER TO CREATE SCHOOL OF FINE ARTS, IN THE OLD TOWN OF CHANIA, CRETE".
  • The project includes the restoration of a 2.500sq.m. historic listed building, on three levels and its configuration to accommodate the School of Fine Arts.It includes classrooms, laboratories, offices. The project includes laboratories of sculpture, printmaking, painting, religious painting, metal etc. The areas are air-conditioned and a 630KVA power substation has been installed.

  • BUDGET: 4.900.000 €
  • PARTICIPATION PERCENTAGE: 100 %
  • CLIENT: UNIVERSITY OF CRETE
  •  
  • 2003
  • ELECTROMECHANICAL DESIGN OF PROJECT : "CONSTRUCTION OF MUNICIPAL BUILDING IN ARKADI, ZAKINTHOS ISLAND".
  • It is a 2.000sq.m. building, spread on three levels, which includes classrooms, offices etc.

  • BUDGET: 2.800.000 €
  • PARTICIPATION PERCENTAGE: 50 %
  • CLIENT: MUNICIPALITY OF ARKADION, ZAKYNTHOS
  •  
  • 2002
  • ELECTROMECHANICAL DESIGN OF PROJECT "SUPPORT CENTER FOR WORKING WOMEN - YOUTH CREATIVE ACTIVITY CENTER".
  • The project includes activities and events halls, offices, kitchen - restaurant etc.

  • BUDGET: 1.208.000 €
  • PARTICIPATION PERCENTAGE: 50 %
  • CLIENT: TOME S.A.
  •  
  • 2002
  • ELECTROMECHANICAL DESIGN OF PROJECT "LABOR CENTER AND YOUTH LABOR CENTER IN KALAMATA".
  • The building included a theater and a conference hall of 300 seat capacity, offices and an underground parking.

  • BUDGET: 3.705.000 €
  • PARTICIPATION PERCENTAGE: 100 %
  • CLIENT: KAPETANIDI BROTHERS A.T.E.
  •  
  • 1997
  • ELECTROMECHANICAL DESIGN OF PROJECT "CONFERENCE HALL CONFIGURATION AT MINISTRY OF CULTURE BUILDING, 20 BOUBOULINAS STR., ATHENS"
  • The project includes an conference hall for 300 people. The studies that were performed are: water supply system, sewerage, electrical installation, air conditioning, fire detection, fire fighting, special and general lighting, 5 language translation system, microphone system, Dolby surround audio system , projectors.

  • BUDGET: 730.282 €
  • PARTICIPATION PERCENTAGE: 100 %
  • CLIENT: L. PAPAMERKOYRIOS - K.TSIOYFIS
  •  
  • 1996-1997
  • ELECTROMECHANICAL DESIGN OF PROJECT "HISTORIC - PROTECTED BUILDING RESTORATION AND CONVERSION TO ART GALLERY"
  • The building covers three floors and includes showrooms, a multipurpose room and office facilities. All areas of the building are equiped with an air conditioning system and a 30 RT power cooling system.

  • BUDGET: 748.000 €
  • PARTICIPATION PERCENTAGE: 100 %
  • CLIENT: PAPANIKOLAOY S.A.-MPARDIS S.A.
  •  
  • 1996
  • ELECTROMECHANICAL DESIGN OF PROJECT "RESTORATION AND CONFIGURATION OF NEW SANTORINIS' ARCHAEOLOGICAL MUSEUM"
  • The project includes new exhibition halls of antiquities with general and special lighting, maintenance workshops, engineering spaces, warehouses etc.

  • BUDGET: 1.694.000 €
  • PARTICIPATION PERCENTAGE: 100 %
  • CLIENT: VRANAS STEFAS – ANASTASIOS ANTHIS
  •